■Company Outline
Address 6F Kyodo Bldg 1-5 Kanda Suda-cho,
Chiyoda-ku, Tokyo 101-0041, Japan
TEL03−5294−3131 FAX03−5294−3132
Established 1986. 9.1
Principal Director Takahiko Yanagisawa
Capital ¥10,000,000
Scope of Work Architectural design
(specializing in theaters, museums, and other cultural buildings).
urban design, landscape design.


■Company History
・New National Theatre, Tokyo :
Architectural desing, stage equipment design and site supervision
(Floor area : 68,879sq.m)
 1986  First prize in international design competition , appointed as architect.
 1986 〜'87 Basic design 1988 〜'90 Detailed design
 1992 Start of construction 1997 Completion・Theater Opened
Kazumasa Nakagawa Art Museum, Manazuru : Design and site supervision (Floor area : 904sq.m)
 1987 First prize in limited competition, appointed as architect.
 1987 Basic design and detailed design 1987 Start of construction
 1988 Completion 1989 Museum opened
Tokyo Opera City : Design and site supervision (Floor area : 242,545sq.m)
 1989 Appointed as architect
( Joint design with NTT Power and Building Facilities Inc, and Urban Planning and Design Institute Co).
 1989 〜'91 Basic design 1991 〜'92 Detailed design
 1992 Start of construction 1999 Proposed Completion
・Museum of Contemporary Art, Tokyo : Design and site supervision (Floor area : 33,515sq.m)
 1989 First prize in limited proposal competition, appointed as architect.
 1990 Basic design 1991 Detailed design
 1991 Start of construction 1994 Completion
 1995 Museum opened
Koriyama City Museum of Art : Design and site supervision (Floor area : 6,848 sq.m)
 1990 First prize in limited proposal competition, appointed as architect.
 1990 Basic design and detailed design 1990 Start of construction
 1992 Completion・ Museum opened
Mitaka City Arts Center : Design and site supervision (Floor area : 9,983sq.m)
 1991 First prize in limited proposal competition, appointed as architect
(Joint Design with Theater Engineering Institute).
 1991 〜'93 Basic design and detailed design
 1993 Start of construction 1995 Completion・Theater Opened
・Utsubo Kubota Memorial Museum : Design and site supervision (Floor area : 477sq.m)
 1991 Appointed as architect 1991 〜'92 Basic design and Detailed design
 1992 Start of construction 1993 Completion・ Museum opened
Tomioka City Museum・Fukuzawa Ichiro Memorial Gallery :
Design and site supervision
(Floor area : 4,125sq.m)
 1992 First prize in limited proposal competition, appointed as architect.
 1993 Basic and detailed design 1993 Start of construction
 1995 Completion・Museum Opened
Saitama Museum of Literature, Okegawa City Arts Theatre :
Design and site supervision
(Floor area : 13,700sq.m)
 1993 First prize in limited proposal competition, appointed as architect.
 1994 Basic design 1994 〜'95 Detailed design
 1995 Start of construction 1997 Completion. Complex opened.